Small Villa, Big Party: Using Sanicubic 1 WP Lifting Station for Independent Home Events
Villas often expand over time with additions such as a pool house bathroom, basement lounge, guest toilet or garden wing. These new facilities may be located below the sewer line or far from the main soil stack, making conventional gravity drainage difficult. Planning the drainage system during construction, renovation or extension work can help avoid costly disruption later. The Sanicubic 1 WP is a floor-standing grinder lifting station designed for independent homes and villa extensions. It provides a practical way to connect new bathrooms and appliances to the main drain, including in spaces planned for future family gatherings.

Villas rarely stay the size they were built at. A pool house is added, the basement becomes a lounge, a guest toilet is carved out near the garden, a new wing goes up for visiting family. Each addition needs a bathroom, and each bathroom needs drainage the original plumbing plan never imagined. When the new facility sits below the sewer line or far from the soil stack, gravity cannot help, and breaking finished floors is the last thing a homeowner wants. The Sanicubic 1 WP, the home-ready model in SFA India's Sanicubic 1 range, is a floor-standing lifting station that lets villa owners, architects and builders plan these extensions with confidence.
Planning Villa Extensions: Why Drainage Needs to Grow with Your Home
Independent homes are designed around today's household. Over the years, the needs change: a pool-side washroom for swimmers, a basement lounge or home theatre, a guest toilet near the entertaining area, an extension for a growing family. These facilities are frequently added later, far from the soil stack or below the level of the sewer, and trenching new pipework through a finished home is disruptive and expensive. A floor-standing lifting station solves the geometry. Wastewater collects in a sealed tank and is pumped up and away to the drain, so the new bathroom can go where the design needs it. Deciding this at the planning stage means the extra capacity is already there for busy occasions such as a family function.
Sanicubic 1 WP: The Floor-Standing Lifting Station
Designed, made and tested in France by SFA, wastewater drainage specialists since 1958, the Sanicubic 1 WP is a floor-standing grinder lifting station. It handles up to two WCs plus a washbasin, sink, shower, bath, bidet, washing machine and dishwasher. Its 32-litre tank and single motor deliver up to 15 m³ an hour and lift wastewater as high as 13 metres vertically through standard 50 mm pipework. For a villa, that reach is generous: a pool house bathroom, a basement lounge or a guest toilet can all be connected back to the main drain.
Reliable Performance for Everyday Use
An added bathroom should work as quietly and reliably as the original ones, year after year. The Sanicubic 1 WP's grinder impeller reduces waste so it flows through slim pipework, a non-return valve stops backflow, and four inlets of different sizes, from 40 to 110 mm, take every fixture in the room. The IP68 system is waterproof and prevents odours escaping into the washroom. An external hard-wired audio-visual alarm gives the household early warning, and water up to 70°C is tolerated for short periods, which helps when a dishwasher or washing machine is connected.
Installation for Extensions and Renovations
The Sanicubic 1 WP stands on the floor and needs no core cutting or pit digging, so it can sit in a basement, garage or utility room without disturbing finished flooring. It can be specified during construction or added later during a renovation. A removable top cover gives direct access to the motor and electrical parts, which keeps servicing simple.
Why Specify the Sanicubic 1 WP
- Two WCs and more: Also takes a basin, sink, shower, bath, bidet and appliances
- High reach: Up to 13 m vertically at 15 m³/h
- No civil work: Floor-standing, with no core cutting or pit digging
- IP68 waterproof system: Helps prevent odours escaping
- Easy maintenance: Removable top cover with direct motor access
- 2-year standard warranty: Backed by SFA India's nationwide technical support network
Technical Specifications
| Specification | Detail |
| Number of Motors | Single motor |
| Max. Head | 13 m |
| Max. Flow Rate | 15 m³/h |
| Discharge Diameter | 4 |
| Number of Inlets | 50 mm |
| Max. Water Temperature | 70°C (5 min) |
| Total / Usable Volume | 32 L / 10 L |
| Type of Impeller | Pro X K2 grinder |
| IP Rating | IP68 |
Where It Fits in a Villa Extension
Think of the pool house bathroom, the basement entertainment room, a guest toilet in the garden wing or a ground-floor powder room in a converted villa. Each sits below or far from the soil stack, and each is the kind of facility that sees heavy use when family and friends gather. Planning for it early keeps the design flexible. For larger gatherings, such as wedding venues, SFA's dual-motor Sanicubic 2 range is the better match.
SFA India: Pump Solutions Specified Across India
SFA India is part of the global SFA Group, a pioneer in wastewater pump solutions with over six decades of innovation since 1958. The Sanicubic 1 WP is designed to European quality standards, and many SFA products carry the Made in France label. Architects and homeowners across India specify SFA for reliability and dependable after-sales support, with a standard 2-year warranty and a service team at +91 22 6993 1900.
Plan Your Villa Extension with the Sanicubic 1 WP
SFA India works with architects, interior designers and homeowners from early planning through renovation and extension. Share your layout and the facilities you plan to add, and SFA India's technical team can help you choose the right station.
Explore the Sanicubic 1 WP lifting station here or contact SFA India for more information.
Frequently Asked Questions
The Sanicubic 1 WP is floor-standing and does not require core cutting or pit digging. It can be installed during a new build or added during a renovation without extensively disturbing finished floors.
The unit has a removable top cover that provides direct access to the motor and electrical components. It also includes an external hard-wired audio-visual alarm to provide an early warning if attention is required.
It can be used for a pool house bathroom, basement bathroom or lounge, garden-wing toilet, ground-floor powder room, guest suite or other new facilities added during construction or renovation.
Its Pro X K2 grinder impeller reduces waste before pumping, allowing wastewater to pass through standard 50 mm discharge pipework. A non-return valve also helps prevent backflow.
A new bathroom or utility area may be below the sewer line or located far from the main soil stack. A lifting station collects and pumps the wastewater to the drainage network when gravity drainage is not practical.
They should consider the location and number of fixtures, the level of the existing sewer line, the distance to the soil stack, future household requirements and whether the installation can be completed without disturbing finished floors.
The Sanicubic 1 WP is floor-standing and does not require core cutting or pit digging. It can be installed during a new build or added during a renovation without extensively disturbing finished floors.
Its Pro X K2 grinder impeller reduces waste before pumping, allowing wastewater to pass through standard 50 mm discharge pipework. A non-return valve also helps prevent backflow.
The unit has a removable top cover that provides direct access to the motor and electrical components. It also includes an external hard-wired audio-visual alarm to provide an early warning if attention is required.
A new bathroom or utility area may be below the sewer line or located far from the main soil stack. A lifting station collects and pumps the wastewater to the drainage network when gravity drainage is not practical.
It can be used for a pool house bathroom, basement bathroom or lounge, garden-wing toilet, ground-floor powder room, guest suite or other new facilities added during construction or renovation.
They should consider the location and number of fixtures, the level of the existing sewer line, the distance to the soil stack, future household requirements and whether the installation can be completed without disturbing finished floors.